{"product_id":"xdp-remanufactured-7-3l-ae-fuel-injector-xd475-for-1999-5-2003-ford-7-3l-powerstroke-8-long-lead","title":"XDP Remanufactured 7.3L AE Fuel Injector XD475 For 1999.5-2003 Ford 7.3L Powerstroke (8 Long Lead)","description":"XDP Model XD475\u003cbr\u003e\u003cbr\u003e\u003cp\u003eThe Remanufactured 7.3L AE Fuel Injector XD475 will replace the damaged #8 Long Lead injector in your 1999.5-2003 Ford 7.3L Powerstroke. With years of manufacturing experience and over 30 million diesel fuel injectors produced to date, you can be sure you are getting a quality product.\u003c\/p\u003e\n\u003cp\u003eBy surpassing the manufacturers' current design specifications, these injectors have less than 0.2 percent warranty rate. Every injector is comprehensively tested for nozzle flow and needle lift as well as opening operation and leakage.\u003c\/p\u003e\n\u003cp\u003eAdditional tests include shot-to-shot flow meters, poppet seat leakage test, and injection timing measurements for best-in-class testing. Quality and Testing Advanced end-of-line testing, delivery, leakage and opening characteristics.\u003c\/p\u003e\n\u003cp\u003ePrecision remanufacturing process ensures highest quality, reliability and performance. Opening clearances are set to strict specifications; validated with engine and vehicle testing and compared to OE product.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eFeatures:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eStock HP and Flow Rating\u003c\/li\u003e\n\u003cli\u003eBest In Class End-Of-Line Testing Nozzles\u003c\/li\u003e\n\u003cli\u003eTested For Flow, Leakage and Needle Lift\u003c\/li\u003e\n\u003cli\u003eIn-Line Error Proofing Incorporated In Assembly Process\u003c\/li\u003e\n\u003cli\u003eWarranty Info:  2 Year \/ Unlimited Mileage\u003cbr\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Powerhouse Diesel","offers":[{"title":"Default Title","offer_id":50163894681738,"sku":"XD475","price":164.95,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0625\/5548\/8394\/files\/XD475_3-HVCD.jpg?v=1788902735","url":"https:\/\/pistontwistin.org\/products\/xdp-remanufactured-7-3l-ae-fuel-injector-xd475-for-1999-5-2003-ford-7-3l-powerstroke-8-long-lead","provider":"Piston Twistin LLC","version":"1.0","type":"link"}